Particle.news

Download on the App Store

Final Safety Inspections Underway for Mumbai Metro Line 3 BKCWorli Stretch

The 9.77-km segment of the Aqua Line is expected to open for public use as early as next week, advancing the phased rollout of Mumbai's underground metro system.

Mumbai, India. Sep 24, 2024: First look at newly constructed Metro Line 3, also known as the Aqua Line, ahead of the inauguration of Mumbai's first underground Metro. Mumbai, India. Sep 24, 2024. (Photo by Raju Shinde/HT Photo) (Hindustan Times)
Image

Overview

  • The Commissioner of Metro Rail Safety (CMRS) has initiated final inspections on the BKC–Acharya Atre Chowk segment, with a full evaluation scheduled around April 10.
  • If safety clearances are secured, the 9.77-km stretch could be operational by the weekend or early next week, according to project sources.
  • The Aqua Line, partially operational since October 2024, currently runs between Aarey JVLR and BKC, covering 12.69 km.
  • Once fully completed by July 2025, Metro Line 3 will span 22.5 km, feature 16 underground stations, and significantly enhance connectivity across Mumbai.
  • A key engineering highlight of the new stretch includes tunneling beneath the Mithi River, showcasing the project's advanced infrastructure capabilities.